Before 3pm on a working day, contacted the same day. After 3pm, the next working day. Contact, not a quotation. Telephone
Start a project brief
Beneath a flat roof: the metal deck soffit under a continuous cream closed-cell layer between white steel beams.

Guide · Roofs12 min read

How to insulate a flat roof from the inside on a commercial building.

It depends on the deck. Metal decks and concrete soffits can take closed-cell spray foam bonded directly to the underside; timber decks need a condensation risk analysis first. We confirm the depth at survey.

The short answer

How to insulate a flat roof from the inside depends on the deck. Metal decks and concrete soffits can take closed-cell spray foam bonded directly to the underside, with a fire coating where it stays exposed. Timber decks need a condensation risk analysis first, because a sealed layer below can trap moisture. We confirm the depth at survey.

Metal and concreteclosed-cell bonded directly to the underside
Timbera condensation risk analysis first
Roofer firstfor leaks; spray foam is not waterproofing

The attraction is keeping your roof on while we work beneath it. But first we need to know what is above the ceiling: the deck, old insulation, membranes and weather covering. That is what makes an inside route a sound choice.

HOLVEM insulates commercial buildings nationwide across England and Wales and specifies the insulation, depth and finish for each construction. See our flat roof spray foam insulation service.

01What the deck is

First: what is the deck made of?

Start with the roof layers, from the weather covering down to the lining. Send drawings, reports and photographs of water marks or known repairs. Tell us which areas you can see and which are concealed.

Three decks, from outside to inside

Metal deckClosed-cell bonded below

Metal deck section: weather covering and old insulation above, the profiled deck, closed-cell bonded beneath it and a fire coating below.OUTSIDEINSIDE12345
  1. Weather coveringRetained; leaks go to a roofer first.
  2. Old insulation and membranesRetained, and part of the moisture check.
  3. Metal deckSound and prepared on the underside.
  4. Closed-cell, bonded belowDirectly to the underside; depth set at survey.
  5. CoatingWhere it stays exposed, as your fire strategy requires.

Concrete soffitBonded insulation below

Concrete soffit section: weather covering and construction above, the slab, closed-cell bonded beneath it and the finish below.OUTSIDEINSIDE12345
  1. Weather coveringRetained; leaks go to a roofer first.
  2. Construction aboveWhat the slab separates affects the calculation.
  3. Concrete slabSlab, supports and junctions checked.
  4. Closed-cell, bonded belowTo the whole-element target; depth set at survey.
  5. FinishSet by the fire strategy and the tested assembly.

Timber deckMoisture path first

Timber deck section: weather membrane, timber deck, joists and cavities, and lining; the internal layer is left undecided until the condensation risk analysis.OUTSIDEINSIDE??12345
  1. Weather membraneIncluded in the condensation risk analysis.
  2. Timber deckIts state checked before any inside build.
  3. Internal layer, undecidedOnly if the analysis supports it; no standard foam depth.
  4. Joists, old insulation and cavitiesDrying route and ventilation in the design.
  5. LiningWith future inspection access.
Sections not to scale. The retained roof stays above; the proposed internal layer goes beneath the deck. With timber, the condensation risk analysis decides the build-up. We set the depth for your roof at survey.
Deck or soffitInternal route to assessMoisture checkFire and finishDepth basis
Metal deckSuitable closed-cell layer bonded below, with any other specified layersRetained build-up, operating conditions and interfacesApplicable tested assembly and required coating or liningCalculation and objective; food-sector example used 140 mm
Concrete soffitBonded insulation below a suitable slabConstruction above, slab details and conditions belowApplicable tested assembly and finishWhole-element target; The Box example used 120 mm
Timber deckA designed internal or hybrid assembly, if the assessment supports itCondensation risk analysis before material choice; drying and vapour controlApplicable assembly, lining and needed inspection detailsComplete proposed build-up; no standard foam depth

These depths come from real jobs. We set the depth for your roof at survey.

If the roof leaks, get a roofer in first. If the deck or supports need checking, bring in the roofing or structural professional before adding insulation.

02Metal deck from below

Metal deck from below

On a sound metal deck, we can bond closed-cell foam directly to the underside. Your proposal shows the preparation, depth, coverage, edges and finish, including what stays clear.

Next, look at the space below. Services, old linings and tight voids change how we inspect and install. We'll agree what moves, what is protected and how we reach the deck.

At the food-sector units in London, we insulated 324 m² of metal-deck soffit with 140 mm closed-cell, gauged at 29 points and coated.

At Derriford District Centre, the design U-value was 0.18 W/m²K, using closed-cell bonded to a metal-deck soffit plus open-cell. Read Derriford.

Project recordRoof underside
Roof underside sprayed in continuous passesReal installation footage, from below.

03Concrete soffit from below

Concrete soffit from below

With a concrete soffit, tell us what the slab separates. The space above and use below affect the heat-loss calculation and the installation plan.

We need the slab, supports, services and junctions as well as the target and finish. A soffit beneath fixed equipment needs a different protection plan from an empty floor.

At The Box, Plymouth, we applied 120 mm closed-cell beneath 787 m² of concrete soffit to a specified U-value of 0.18 W/m²K.

At Pondswick substation in Luton, we insulated and coated 127 m² of concrete soffit beneath live switchgear, so the access and protection plan mattered as much as the insulation.

Read soffit insulation and The Box. Other matched soffit records are available through HOLVEM projects.

04Timber decks

Timber decks: when to insulate from inside and when not

With timber, the moisture path comes first. A sealed layer below the deck changes how the roof dries, so we check the old layers and timber before choosing an inside build.

Your condensation risk analysis includes the weather membrane, deck, existing insulation, cavities and lining. Ventilation and future inspection access are part of that design.

The result may support insulation from inside, a hybrid build or a different route. We'll explain the choice. Access convenience alone can't decide the moisture design.

Access convenience alone can't decide the moisture design.

Across more than 29 schools in Hampshire and Berkshire, we applied open-cell foam within flat-roof constructions. Read the schools programme.

If we can't identify the old layers or state of the deck, we arrange further inspection. Where the roof already needs renewal, it makes sense to compare the external insulation route at the same time.

05Condensation risk analysis

Condensation risk analysis

Our condensation risk analysis checks your roof against its operating conditions. We use BS EN ISO 13788, with dynamic analysis to BS EN 15026 where needed. The result comes with the layers and assumptions that produced it.

So you can see where air and vapour control sit and how moisture behaves through the roof. The foam name is only one part of that answer.

Correctly diagnosed and specified, closed-cell spray foam stops roof condensation. Zero call-backs for condensation. The depth is typically 25 mm or 50 mm closed-cell, depending on the roof make-up, confirmed before we spray, with a condensation risk analysis where needed. Spray foam is not waterproofing, so existing leaks go to a roofer first.

TJW Grab Hire in Bournemouth has a pitched metal roof, not a flat deck, but it shows the result: about 505 m² at 50 mm closed-cell under a sound box-profile roof, and the customer reported the condensation was eliminated. Read TJW Grab Hire.

Backed by our 25 year HOLVEM workmanship warranty, plus the manufacturer's 25 year product warranty issued directly to you.

06Fire and coatings

Fire and coatings

Your fire strategy sets the required finish. We include the coating or lining in the design and quote, with the test evidence that applies to that build-up.

The manufacturer's coated B-s2,d0 test used 35 to 40 mm on 9 mm plasterboard, with intumescent coating at 0.7 mm wet film thickness. The separate uncoated Class 1 surface-spread-of-flame test to BS 476-7 used 45 to 50 mm on 9 mm plasterboard.

Each result applies to its tested build-up. We check it against the metal deck, concrete or timber construction proposed for your building, then include the finish evidence in your handover.

Read fire performance and coatings for the test details and how we use them.

07U-values

U-values: calculate the whole roof

The U-value calculation includes the old layers, new insulation and thermal bridges. Send your designer's target and the roof drawings; we'll show how the complete element performs.

For new or replacement elements under England's 2021 Approved Document L Volume 2, incorporating 2023 amendments, Table 4.1 gives a flat-roof limit of 0.18 W/m²K. Renovations use their own provisions, and Wales has separate guidance. Your designer confirms the target for your work.

A new English edition is published for the coming changes. Its main start date is 24 March 2027, with separate higher-risk-building and transitional provisions. Your designer confirms which edition applies to the work.

Read U-values and Part L and building regulations U-values.

08The commissioning checklist

Step by step: the commissioning checklist

  • Identify the deck and all known layers from covering to internal finish.
  • Establish water entry, visible condition and any roofing or structural work needed first.
  • State the building use and objective, including any written thermal target.
  • Assess the proposed moisture arrangement, especially for timber and hybrid assemblies.
  • Calculate the complete element with the thermal bridges.
  • Establish applicable fire evidence and the coating or lining required.
  • Agree access, protection, working zones, ventilation and re-entry plan.
  • Write the surface, area, depth, interfaces, exclusions and finish into the work.
  • Check applied thickness and coverage against that work and compile the evidence.
  • Keep calculations, specification and installation records with the building file.

Use this checklist to commission the work and check the quote. The installation itself needs a planned working zone, access and trained installers.

Compare the installed methods

MethodTypical installed cost per m²What you are buying
Closed-cell spray foam, 25 mm£16 to £25 + VATFoam only on a sound, prepared surface; the roof stays in place
Closed-cell spray foam, 50 mm£22 to £35 + VATFoam only, with depth confirmed for your roof at survey
PIR or rigid boards£30 to £50 installedA fitted board system; compare supports, joints and finish
Mineral wool and liner£20 to £30 installedInsulation with its supporting liner and vapour-control details
Roof overcladding£60 to £90A new weather-facing roof system over the retained roof
Insulated panels or replacement£100 to £160 + VATA new insulated roof, with removal and access checked in the quote

These are the method figures in our cost guide, not a quote for your building. The guide does not state a VAT basis for the board, mineral-wool and overcladding rows, so ask the contractor to confirm it. Added coatings and external foam systems are priced per project. Compare what is included before you compare the totals.

09What the projects prove

Projects: what each example proves

The London food-sector job shows a coated metal deck checked at 29 points. The Box shows a concrete-soffit calculation; Derriford uses different layers; Pondswick shows how live switchgear changes the plan below. Those are the details to compare with your building.

Your own roof gets its own depth, finish and access plan.

The school roofs add an open-cell route to that picture. So begin with the construction you have, then choose the material.

10Which route fits

Three questions point to the first step.

Answer the three below. The result names the first step; the survey confirms the depth and the build-up.

Insulating a flat roof from inside

Your roof, in three answers.

1What is the deck made of?
2Does water come in when it rains?
3What must the work achieve?

Request a survey

Ask for a survey. We ring to arrange it around your floor.

Where the building is and how to reach you. A specialist rings to agree a time that suits the shift pattern; the survey is free and carries no obligation.

Enter your name.

Enter a UK postcode.

Enter an email address or a telephone number.

Enter an email address or a telephone number.

Before 3pm on a working day, contacted the same day.

11HOLVEM

Why choose HOLVEM for flat-roof insulation from inside?

Keeping your roof on is useful only if the layers beneath it work together. We check the deck, existing insulation and moisture path, then calculate the depth and set the finish. That gives you a roof-specific answer, not a thickness picked from another job.

At the London food-sector units, we applied 140 mm closed-cell beneath 324 m² of metal deck and gauged it at 29 points. At The Box, we followed an irregular concrete soffit with a 120 mm layer. The details change; the care does not.

Our own team surveys, specifies and installs nationwide across England and Wales from four depots. You get certified spray foam systems, which we apply as an accredited installer for the manufacturer, with the written calculations, specification and QA evidence pack for your building file.

Backed by our 25 year HOLVEM workmanship warranty, plus the manufacturer's 25 year product warranty issued directly to you.

12Questions, answered

Questions about insulating flat roofs from inside

Can you insulate a flat roof from underneath?

Yes. On a sound metal deck or concrete soffit, we can install from below. A timber deck needs its moisture analysis first. We confirm the layers, depth, finish and access at survey.

Is spray foam suitable under a timber flat roof?

The condensation risk analysis decides. We check the old layers, timber, drying route, vapour control and ventilation before choosing open-cell, closed-cell or another build.

What U-value does a flat roof need?

Confirm jurisdiction, work category and applicable guidance with the project team. England's current Table 4.1 flat-roof limit is 0.18 W/m²K for the work it covers; renovations have separate provisions. Calculate the proposed whole element rather than assigning a foam thickness to the target.

Do you need a vapour barrier?

The condensation risk analysis sets the vapour-control layers and junctions. We include old membranes and the drying route, then show the full build-up in your specification.

Can the building stay in use?

We plan the work around the areas you can release. Other parts of the building can keep operating while the application zone is separated, protected and ventilated. We'll agree re-entry with you before work starts.

Send drawings and photographs. Include the deck, old layers and the result you need.

13In five lines

Insulating a flat roof from inside, in five lines.

  1. How to insulate a flat roof from the inside depends on the deck: start with every layer, from the weather covering down to the lining.
  2. On a sound metal deck or concrete soffit, we bond closed-cell foam directly to the underside, with the coating or lining your fire strategy sets.
  3. With timber, the moisture path comes first: the condensation risk analysis decides between an inside build, a hybrid or a different route.
  4. The U-value calculation covers the complete element, with the old layers and thermal bridges; a depth from another job is not your depth.
  5. If the roof leaks, get a roofer in first; spray foam is not waterproofing.

The next step

Send drawings, or start a project brief.

Send drawings and photographs with the deck, old layers and the result you need, or start a project brief with your designer's target.

Back to the three questions

Where this guide leads

The pages that go deeper on your building, your roof and the price.

Your next step

Your building.
Your brief.
A specialist.

If you already know the thickness or U-value you need, we price to it and confirm it is right; if not, we work it out with you. Tell us what you know about the building and the problem; if something is uncertain, say so. Someone who does this every day reads it and comes back to you.

Start a project brief About five minutes. Photographs help; nothing else is needed.

Or pick up the phone

Telephone . Before 3pm on a working day, you are contacted the same day. After 3pm, the next working day. A commitment to contact, not a quotation.

Want a figure before you talk to anyone? Pick your building for a same-day estimate