02Where each document goes
Three files, three sets of documents.
The same library serves the assessor checking a calculation, the quantity surveyor building a tender file and the principal contractor's CDM file. Each needs a different set.
01 · For the assessor
The calculation and its basis.
The U-value calculation with its assumptions listed, the condensation risk analysis and, where it was run, the WUFI summary; the product data sheet the λ came from; and the BBA certificate for the product.
Each figure in the calculation is traceable to a document here.
02 · For the tender
Certification and classification.
The BBA certificates for the products, the reaction-to-fire classification report for the coated system, and the coating data sheet. Insurance certificates are sent directly, on request.
HOLVEM's other confirmed claims for a tender: nationwide coverage, endorsed by architects, engineers and commercial clients, and expertise across thousands of projects.
03 · For the CDM file
Method, risk and safety.
The method statement and risk assessment written for the building, the safety data sheets for both components of the foam and for the coating, and the sequence the roof is worked in, bay by bay.
Prepared per project; the sample shows the format.