Enquiries received before 3pm on a working day are contacted the same day; after 3pm, the next working day. Contact, not a quotation. Telephone
Start a project brief
A cut-away view of a commercial roof edge in daylight: profiled metal sheet over a cream closed-cell foam layer, on steel purlins and a concrete upstand, with a town skyline behind and a pale daylit wall to the left.

Better buildings
begin beneath
the surface.

HOLVEM is a commercial building-performance company. We establish what is happening in the building first, then specify what should change beneath the surface.

02Project records

See the work beneath the roof.

Once you have a roof in mind, it helps to see how the work reaches it. Our installation footage shows continuous passes beneath profiled sheets, around supporting members and up to the agreed edges of rooflights.

Project recordContinuous passes
Enverge NexSeal LE applied in continuous passesReal installation footage.
Looking up inside a working warehouse: a steel portal frame roof with its underside sprayed in a continuous off-white closed-cell layer, lattice trusses and lighting beneath it, and loaded blue pallet racking in the corner of the frame.
Project recordSteel portal frame
Steel portal frame warehouseContinuous closed cell air and vapour seal, racking in place beneath it.
Project recordRoof underside
Roof underside sprayed in continuous passesClosed cell, from below.
An empty warehouse floor looking towards an open roller-shutter door: the whole profiled steel roof and its purlins sprayed from beneath in a continuous pale closed-cell layer, rooflights and high-bay lights left exposed.
Project recordRooflights exposed
Warehouse roof sealed from beneathClosed cell; the rooflights left exposed, the layer stopped at each.
Project recordEncapsulated
Asbestos cement roof encapsulated in placeClosed cell; the roof retained.
A long industrial unit seen along its length: lattice steel roof trusses and a profiled metal roof sprayed from beneath, strip lights hung below, the floor cleared for the work.
Project recordProfiled metal roof
Profiled metal roof sprayed from beneathClosed cell, trusses wrapped.
Project recordWalls sealed
Walls sprayed and sealed in continuous passesClosed cell.
Inside a large single-storey industrial unit: the pitched roof and its steel trusses sprayed from beneath in a continuous cream closed-cell layer, the concrete floor cleared beneath it.
Project recordIndustrial unit
Industrial unit roof insulatedClosed cell, the whole underside.

Explore the project records

03Who HOLVEM are

The building comes first. The foam comes second.

If the roof is sound, you may not need to replace it. Where the construction suits it, we insulate from beneath, with the roof still in place. Existing leaks go to a roofer first; the insulation is not waterproofing.

An assessment set up inside an empty portal-frame warehouse: a cut-away section model of the building with a cream layer beneath its roof, a thermal imaging camera, a moisture meter, a temperature probe, a roof section drawing and a cut block of closed-cell foam. Building performance. Engineered.

Certified

You get certified spray foam systems, which we apply as an accredited installer for the manufacturer. Your written specification and QA evidence pack show what was specified and applied.

England & Wales

Our own team surveys, specifies and installs across England and Wales from Weybridge, Bedford, Manchester and Exeter.

Thousands

Over 20 years' experience across thousands of projects informs those decisions.

About HOLVEM

04Moisture first

Understand the water before choosing the layer.

Water across a cold underside and rain entering at a failed lap need different work. We establish the cause, then check the proposed build-up with a condensation risk analysis where needed. Where the simple method is inconclusive, WUFI examines moisture behaviour over time.

Simple monthly method

BS EN ISO 13788

condensate at the deck, g/m²

Flagged. On monthly averages the water that forms at the deck in winter has not cleared by the end of summer, so the method cannot pass the roof.

10-year dynamic simulation

WUFI · BS EN 15026

total water content, falling year on year

Shown to dry. With real hourly weather and the materials' own moisture storage, each winter holds less water than the last. The roof dries out year on year.

Example calculation, not a forecast.

Correctly diagnosed and specified, closed-cell spray foam stops roof condensation. Done to the right specification, roof condensation should be solved the first time. Once we've confirmed condensation, set the correct depth and installed to the agreed specification on a roof with no existing leaks, we stand behind the result. You should not need to call us back about condensation.

Guaranteed to stop condensation when we confirm it is condensation at survey, set the depth, and the roof has no existing leaks.How condensation risk analysis works

06How we work

From your photographs to the handover file.

See how a job runs

07Selected project records

Different buildings. Specific results.

The specification changes with the job. These records show what we applied and the evidence behind it.

Your HOLVEM QA evidence pack brings the specification and installation records together.

View more projects

08Straight answers

Straight answers before you commit.

Bring the questions you have now. You do not need a finished specification to ask them.

What does it cost?
The treated area, depth, preparation, access and finish set the price. Foam-only installs start from £16/m² + VAT at 25 mm; the cost guide gives the full installed bands. Send photographs or drawings for a free estimate; we agree how to confirm the work after reviewing them.
Where do you work?
Across England and Wales, from our four depots in Weybridge, Bedford, Manchester and Exeter. Find commercial spray foam insulation near you.
Where can I see the certificates?
The document library holds the product evidence. Your building has its own written specification; a product certificate does not replace the roof calculation.
Can the building stay in use?
We agree the work areas, protection and re-entry with you. Phasing or out-of-hours work can help where the building allows it. Tell us what cannot stop so the programme reflects it.
Do I need a survey to begin?
No. Photographs or drawings can start a free estimate with a virtual survey. Larger or complex jobs get a free site survey, then a firm written quote. No obligation either way.

Your next step

Why HOLVEM for the building you want to keep.

A good first answer gives you a route forward. We establish the cause, explain the work and put the specification in writing. Your roof stays where the construction is suitable to retain, and measured thickness and coverage records go into your QA evidence pack.

Backed by a 25 year product and workmanship warranty.

Send the building use, photographs and what you are seeing. If you already have a depth or U-value target, include it.

Or call . Enquiries received before 3pm on a working day are contacted the same day; after 3pm, the next working day.