Before 3pm on a working day, contacted the same day. After 3pm, the next working day. Contact, not a quotation. Telephone
Start a project brief
A UK data centre exterior at dusk: a long, low steel-clad hall with a shallow roof, external cooling plant and generators behind a fence, pale cladding under a cool sky.

Building type

Data centres: a sealed, stable envelope, so the cooling plant works less.

The plant holds the hall at its set point; the envelope decides how hard it works. A continuous closed-cell layer seals the roof, walls and soffits, keeps cooled surfaces above the dew point and, coated, carries the fire classification the strategy asks for.

Roofs, walls, soffits, plant areasShell stage, or empty halls under permitFrom £16/m² + VAT at 25 mm

Same-day estimator

About a minute · no obligation

Step 1 of 4: your building.

Which building is it?

This page's building is pre-selected. Change it if yours is different.

Takes about 30 seconds. No contact details yet.

01What is happening

The plant fights the envelope, and the envelope has gaps.

A data hall is held at a tight temperature and humidity by cooling plant that runs all year. Every gap in the roof, walls and soffits is heat and moisture the plant has to deal with, and every cooled surface that meets warm, humid air is a condensation risk: roof voids over the halls, plant areas, the soffits of raised floors and chilled pipework. Nobody wants water near the racks.

Inside the roof void above a data hall: a bare profiled steel roof and purlins above cable containment and ductwork, condensation beaded along a purlin flange, a drip tray fixed beneath it.
The voidWhere the plant loses
  • Set points are tight. Temperature and humidity are held in a narrow band, so every gap in the envelope is load on the plant.
  • Cooled surfaces condense. Where chilled air or pipework meets warm, humid air, water forms; roof voids and plant areas are where it starts.
  • The stakes are the racks. Water, dust and fibres near live equipment are the failures a data centre cannot afford.

It is not a plant fault. The plant is working against the envelope; fixing the envelope lets it work less.

It is not solved by more cooling. More cooling makes more cold surfaces to condense on.

It is not always the roof. Plant areas, soffits and pipework condense too, and the same layer treats them.

02What is applied

One continuous, sealed layer over the roof, walls and soffits.

Closed-cell foam is applied from inside to the roof underside, the walls and the soffits as one bonded layer, closing laps, wrapping purlins and fixings and sealing penetrations. It is rigid, its own vapour control, and it does not shed fibres. Where the fire strategy requires a reaction-to-fire classification, the coated system carries it.

Schematic / not to scaleKeyed 1 to 5 below

Inside a data hall at shell stage after the work: the profiled steel roof, purlins and upper walls in a continuous cream closed-cell layer, cable containment routes and cooling ductwork being installed beneath.
AppliedRoof and walls, sealed
The layer seals the envelope before the containment, ducts and racks go in. Penetrations are sealed around as they are made.
1 / Existing roof or wall

Profiled sheet, composite panel or concrete. It stays as the weather line.

2 / Prepared face

Dust, loose coating and contamination removed, with the hall's cleanliness regime respected.

3 / Closed-cell layer, in passes

Continuous, bonded, over 90 per cent closed cell. λ 0.027 W/mK is the NexSeal LE product figure.

4 / Purlins, rails and penetrations

Encapsulated by the application, and still bridges in the calculation.

5 / Coating, where the strategy requires

B-s2,d0 belongs to the coated NexSeal LE and DC315 system, as tested. Technical space usually asks for it.

03Working around the building

At shell stage, or in an empty hall under permit.

The clean time to seal a data hall is before the racks arrive. Where the facility is live, the work is planned with the operator under permit, in empty halls, plant areas or roof voids, with containment that keeps overspray and dust away from equipment. Nothing is sprayed over live kit.

  1. 1 / 3

    Shell stage first

    Roof, walls and soffits sealed before containment, ducts and racks go in. Penetrations made later are sealed as they are made.

  2. 2 / 3

    Live facility, under permit

    Method statement, permit to work, escorted access and the operator's change control before anyone arrives, to the site's own requirements.

  3. 3 / 3

    Contain and record

    Containment and extraction around the zone, equipment sheeted or excluded, applied thickness and coverage recorded into a QA pack for the file.

04Enverge NexSeal LE

The material we spray, and why it matters.

Enverge NexSeal LE is a two component closed cell polyurethane, spray applied directly onto the prepared substrate. As it cures, it expands and sets into one rigid, continuous layer, bonding into corrugations, laps, fixings and awkward junctions without being cut, jointed or mechanically fixed.

That matters because most insulation problems start at the gaps.

Board systems can leave voids at ribs, laps and junctions, and every gap is a potential cold bridge where warm internal air meets a cold surface and condensation forms, hidden behind the insulation. NexSeal LE is applied as one continuous bonded layer, so there is nowhere for that to start: a sealed, stable building envelope that controls condensation, reduces heat loss and protects the structure underneath.

0.027 W/mKThermal conductivity · aged · BS EN 14315-1
Class 1Surface spread of flame · BS 476-7 · uncoated
B-s2,d0Coated, as tested · BS EN 13501-1
25 yearsWorkmanship warranty, plus the manufacturer’s

HOLVEM also installs open-cell foam. It is a different product with its own data sheet, specified for different objectives: hybrid build-ups, sound absorption, or where the layer has to breathe. It is not what goes onto a cold sheet or a cold soffit. Open-cell system data · Closed-cell system data

HOLVEM spray rig van with Enverge NexSeal LE A and B component drums plumbed into the proportioner.
HOLVEM rigA and B on board
The HOLVEM rig · Enverge NexSeal LE A and B components on board. HOLVEM's own photograph.

05How we check

We check the envelope against the set point before we spray.

A data hall has a set point, not a season. The condensation risk analysis runs with the hall's temperature and humidity inside and the weather outside; the U-value calculation puts a figure on the heat gain the plant no longer has to remove; the fire strategy decides the coating.

  1. 1 / 3

    Condensation risk analysis at the set point

    The roof, wall and soffit build-ups are checked with the hall's controlled conditions inside and the outside climate through the year, to BS EN ISO 13788 and, where the case warrants it, a transient WUFI analysis to BS EN 15026. It states where vapour would condense and what the layer has to do to stop it.

    How the analysis works
  2. 2 / 3

    U-value against the cooling load

    The calculation is done for this build-up to BS EN ISO 6946 with purlins and rails in it, so the reduction in heat gain is a figure the M&E engineer can put against the plant.

    U-values and Approved Document L
  3. 3 / 3

    Fire, for technical space

    Technical space usually carries a reaction-to-fire requirement. The coated NexSeal LE and DC315 system achieves B-s2,d0 to BS EN 13501-1 in the build-up tested; the facility's fire strategy decides where it is specified.

    Fire performance and coatings

06The objective sets the depth

Four objectives. Each one sets the depth.

What does the roof need to do? Pick one below and you will see the depth that does it, and just as plainly what it won’t do. Nothing is left to come out later: the survey confirms the right depth for your building.

Four depths, drawn to one scale and measured from the sheet underside. The objective and the calculation set the thickness on your building.

Pick an objective above to see the depth that does it, and what it won’t do.

Thickness and objective

Want a figure for your building? It takes about a minute.Building, structure, reading, details. A real figure for your facility the same working day; nothing sent to anyone else.

Get my estimate

07Straight answers

Ask us the hard ones.

The questions data centre operators, M&E engineers and developers actually ask on the call, answered the way the specialist answers them. A question we have not answered? Ask it on the call. No obligation.

Can you work in a live data centre?
In empty halls, plant areas and roof voids, under the operator's permit and change control, with containment that keeps overspray and dust away from equipment. Nothing is sprayed over live kit. The clean time is shell stage, before the racks arrive, and that is what we recommend where the programme allows.
Does the foam shed dust or fibres?
The cured layer is rigid and bonded and does not shed fibres. Containment and extraction during application keep overspray inside the zone, and the surface can be coated where the facility's cleanliness regime asks for it, with the finish named in the specification.
How much does data centre insulation cost?
It depends on the depth, and the depth depends on the objective. Condensation control starts at 25 mm and holding the envelope stable at 50 mm; the rate falls as the area rises. A U-value target against the cooling load and the coated Euroclass B system technical space usually asks for are priced per project, because the coating sits on top of the foam.
Will it reduce our cooling load?
Every sealed gap and every insulated square metre of roof is heat gain the plant no longer has to remove, so the direction is clear. A percentage is published only with its basis named: a calculated reduction in heat gain for a given build-up is not a meter reading. HOLVEM supplies the calculation; your M&E engineer can put it against the plant.
Have you done data centres before?
HOLVEM's commercial work covers steel-framed halls, concrete soffits, plant rooms and cold stores, which is the same physics and the same envelope.

The next step

Your building.
Your brief.
A specialist.

If you already know the thickness or U-value you need, we price to it and confirm it is right; if not, we work it out with you. Tell us the hall's size, its structure and whether it is at shell stage or live; the estimator at the top takes about a minute and asks for nothing until the reading is on screen.

Or call . Enquiries received before 3pm on a working day are contacted the same day. After 3pm, the next working day. A commitment to contact, not a quotation, a survey or a price.

Rather write it all down first? Start a project brief · about five minutes, photographs welcome.

Same-day estimate · about a minute Get my estimate