Building problems

Something is wrong with the roof. Start with what you can see.

Water on the floor on a dry morning. A building that will not hold its heat. A roof that rusts, drums in the rain or bakes the floor in July. Twelve problems, each with its own page: what you are seeing, what is causing it, what it is costing you, and what actually fixes it. No product talk until the problem has a name.

  • Nationwide coverage
  • Endorsed by architects, engineers and commercial clients
  • Expertise across thousands of projects

01Water, damp and the fabric of the roof

Six problems that start with water, and the roof that carries it.

Two of these are regularly mistaken for each other, so the first page tells them apart. Each of the others starts from what you can see from the floor and ends with what fixes it, with the facts and their limits written beside them.

Not sure which one you have? Two photographs of the underside usually settle it, and a specialist will say which it looks like.Send photographs

03Before anything is specified

The problem is checked before the answer is chosen.

Every one of these problems has been misdiagnosed somewhere: a leak insulated, a condensation roof repaired, a U-value quoted from a product sheet. So the same three steps sit in front of every recommendation HOLVEM makes, whichever door you came through.

  1. Photographs

    From a phone

    The underside on a cold morning, and again during rain, with the same bay in frame. Sent with a postcode, they tell a specialist which problem it looks like and whether a survey is worth your time.

    Survey, or photographs?
  2. Condition survey

    From below

    Substrate, coating, corrosion, moisture, fixings, and whether the roof is letting water in. A leaking roof is repaired first, by a roofing contractor; the layer goes on afterwards, on a sound, dry sheet.

    How a job runs
  3. Condensation risk analysis

    Before the depth

    The build-up is checked for moisture risk to BS EN ISO 13788, and with a dynamic model to BS EN 15026 where the simple method is inconclusive. The U-value is calculated for the roof as it will be built, bridges included.

    Condensation risk analysis

The layer, when it is the answer: closed-cell spray foam from beneath, with the rate falling as the area rises; the cost guide has the figures. A firm price needs the building.Cost guide: rates per m²

Your next step

Your building.
Your brief.
A specialist.

You do not need to know which problem it is. Tell us what you can see, where the building is and what it is used for; if something is uncertain, say so. Someone who does this every day reads it and comes back to you.

Start a project brief About five minutes. Photographs help; nothing else is needed.

Or pick up the phone

Telephone . Before 3pm on a working day, you are contacted the same day. After 3pm, the next working day. A commitment to contact, not a quotation.

Two photographs first? Send photographs of the roof