A factory roof under a continuous closed-cell layer, the machinery below wrapped in protective polythene sheeting.

Guide · Spray foam basics13 min read

Spray foam insulation problems on commercial buildings, and how to avoid them.

Most problems come from the installation, not the foam: active leaks, the wrong foam on cold metal, a skipped moisture check, poor preparation or fire evidence for a different build-up. Each one is preventable with a proper survey and recorded thickness checks.

The short answer

Spray foam insulation problems on commercial buildings usually come from the installation, not the foam: spraying over active leaks, using the wrong foam on cold metal, skipping a condensation risk analysis, poor surface preparation, or using fire evidence for a different build-up. Each one is preventable with a proper survey, the right specification and recorded thickness checks.

Six checksleaks, material, moisture, preparation, fire and timber
Leaks firsta roofer repairs active leaks before insulation
25 or 50 mmclosed-cell, confirmed before we spray

Before you approve a quote, ask how it deals with those risks. You should be able to see the roof layers, moisture checks and fire finish on paper, not just a picture of a tidy surface.

This guide covers commercial buildings nationwide across England and Wales. We explain the checks we carry out and when we stop a job. Most of these problems are installation and specification failures, and every one is preventable.

01Commercial or home

Commercial buildings and homes: different assessments

A steel warehouse roof, a concrete soffit and a timber loft handle moisture differently. So advice for one needs to be read in the context of its construction.

That's why we start with your building. The covering, old layers and space below it tell us which checks to make.

The Building Safety Regulator's research, published on 28 March 2024, models spray foam on timber sloped roofs in dwellings. Its findings change with the underlay, insulation and air-and-vapour-control layers. It is useful research for those constructions.

Read the official moisture-risk research. For a home-loft question, use the RICS consumer guide and the Property Care Association's homeowner resources, with independent advice for that dwelling.

For your commercial roof, show us the sheet or deck, supports and any old insulation. Tell us how you heat and use the space. Those are the facts we design around.

02Six problems

Six problems and their prevention

Section through a metal roof: two sheets lapped over a purlin with a fixing, a closed-cell layer bonded beneath the sheets and carried around the purlin, a coating on its underside, the depth dimension and the space below. Six numbered checks are marked.OUTSIDEINSIDE123456
  1. LeaksIf rain gets through a lap, fixing or rooflight, a roofer repairs it before insulation.
  2. MaterialOn cold metal, closed-cell gives the rigid, vapour-resistant layer the sheet needs.
  3. MoistureThe use below sets the moisture load; condensation risk analysis checks the build-up.
  4. PreparationDirt, old coatings, corrosion and damage are checked, and the preparation set at survey.
  5. FireAny coating or lining belongs to the tested build-up: substrate, depth and finish.
  6. DepthTypically 25 mm or 50 mm closed-cell, confirmed before we spray; applied thickness checked and recorded.
Where the checks sit on a metal roof, in section: closed-cell bonded beneath the sheets and carried around the purlin. A timber roof needs its deck, supports, membranes and lining recorded first.
ProblemWhat has been overlookedPrevention in HOLVEM's assessment
Insulation over an active leakWater entry through the weather line or a failed detailDiagnose the water; a roofer repairs active leaks before insulation
Wrong foam directly on cold metalThe material's vapour behaviour and the receiving sheetSpecify the suitable material for the substrate and moisture arrangement
Moisture conditions ignoredExisting layers, internal humidity or unusual operating temperaturesAssess the whole build-up and use condensation risk analysis where needed
Poor bond to the substrateSurface condition or preparation needed for adhesionEstablish suitability and preparation before application
Fire claim from another constructionDifferent substrate, depth, coating or liningCheck manufacturer's tested assembly against the project's fire strategy
Timber details concealed without a planMoisture, drying, ventilation or future inspection needsRecord the construction and agree those details before adding insulation

1. Spraying over an active leak

If rain gets through a lap, fixing or rooflight, get a roofer in first. Foam underneath won't repair the opening and can make later investigation harder.

Saying no is part of a proper specification.

Note when the water appears. A wet line after rain and beads across the sheet on a dry, cold morning point to different causes. Your building can have both, so we'll check both.

At The Regis School in Bognor Regis, we insulated one steel container, but the second had a live leak, so we did not spray it. A job should stop before spraying while water is still getting in.

Read roof leak or condensation before treating a wet underside as an insulation problem. Include previous repairs and the timing of recurring water in the enquiry.

2. Choosing the wrong material on cold metal

On cold metal, closed-cell gives us the rigid, vapour-resistant layer the sheet needs. Open-cell is softer and vapour-open. It has acoustic and drying roles in designed builds, but it isn't a swap for closed-cell directly on cold steel.

Ask the installer why the material belongs at that surface. Thermal conductivity alone doesn't answer the moisture question. Old insulation and membranes count too.

Read the closed-cell and open-cell system pages for the material roles. A hybrid assembly must explain each layer's job and the interfaces between them.

3. Skipping the moisture assessment

Next, tell us what happens beneath the roof. A heated workshop, cold store and seasonal warehouse have different temperatures and moisture loads. We need the use as well as the roof layers.

Our condensation risk analysis checks that build-up against the operating conditions. We use BS EN ISO 13788 and dynamic analysis to BS EN 15026 where needed. You get the assumptions with the result.

The calculation also separates two jobs: stopping surface drips and meeting a U-value. They can need different depths. We'll show you why.

Correctly diagnosed and specified, closed-cell spray foam stops roof condensation. Zero call-backs for condensation. Depth is typically 25 mm or 50 mm closed-cell, depending on the roof make-up, confirmed before we spray, with a condensation risk analysis where needed.

At TJW Grab Hire in Bournemouth, about 505 m² of sound box-profile steel roof took 50 mm closed-cell to the underside. The customer reported that the condensation was eliminated. Read TJW Grab Hire.

Backed by our 25 year HOLVEM workmanship warranty, plus the manufacturer's 25 year product warranty issued directly to you.

4. Ignoring surface preparation

A neat finish is only useful if it is bonded to a ready surface. We check dirt, old coatings, corrosion and damage, then set the preparation. That's a job for the survey, before the foam arrives.

Your quote should say what preparation we will do and which repairs need another trade first. If the instruction is just "cover everything", ask for the missing details.

Photographs help us start. Where a finish, concealed layer or inaccessible corner needs a closer look, we arrange it before settling the work.

5. Using the wrong fire evidence

For fire evidence, the build-up matters: substrate, depth and coating or lining. A coated test on plasterboard answers a different question from an exposed metal soffit.

The manufacturer's uncoated Class 1 surface-spread-of-flame evidence to BS 476-7 was tested at 45 to 50 mm on 9 mm plasterboard. The coated B-s2,d0 assembly was tested at 35 to 40 mm on 9 mm plasterboard with an intumescent coating at 0.7 mm wet film thickness.

So ask which test applies to your proposed roof and what finish the quote includes. Keep that evidence with the handover. Read fire performance and coatings.

6. Missing timber, ventilation and inspection details

With timber, we identify the deck, supports, membranes, insulation and lining first. Then we check drying, ventilation and the access needed for future inspection.

The foam name alone won't decide that. A designed vapour-control layer is different from covering a deck whose moisture path nobody has checked.

Before spraying, agree which components need future access. Keep the drawings and installation photographs; the next person maintaining the roof should know what is there.

03Questions to ask

Questions to ask an installer

These are the questions we would ask about your roof. A good installer can answer them clearly.

  • What is the receiving surface, and what condition has been confirmed?
  • What explains the water, and which defects need another trade first?
  • Why is this foam type suitable at this position in the build-up?
  • What moisture calculation or assessment supports the proposed layers?
  • What sets the depth: a thermal target, surface-water objective or another requirement?
  • Which junctions, openings and services are included or excluded?
  • Which fire evidence applies, and what finish is in the quotation?
  • How are applied thickness and coverage checked and recorded?
  • What must be cleared or protected, and when can the area return to use?
  • What documentation is supplied at handover?

Compare the answers with the quote. If the coating, working area or U-value is missing, sort it out before you commission the work. A low price doesn't fill the gap.

Compare the installed methods

MethodTypical installed cost per m²What you are buying
Closed-cell spray foam, 25 mm£16 to £25 + VATFoam only on a sound, prepared surface; the roof stays in place
Closed-cell spray foam, 50 mm£22 to £35 + VATFoam only, with depth confirmed for your roof at survey
PIR or rigid boards£30 to £50 installedA fitted board system; compare supports, joints and finish
Mineral wool and liner£20 to £30 installedInsulation with its supporting liner and vapour-control details
Roof overcladding£60 to £90A new weather-facing roof system over the retained roof
Insulated panels or replacement£100 to £160 + VATA new insulated roof, with removal and access checked in the quote

These are the method figures in our cost guide, not a quote for your building. The guide does not state a VAT basis for the board, mineral-wool and overcladding rows, so ask the contractor to confirm it. Added coatings and external foam systems are priced per project. Compare what is included before you compare the totals.

04What a survey checks

What a proper survey checks

From enquiry to proposal

  1. 01Send what you haveThe drawings, photographs and previous reports you have.
  2. 02The surveyRoof construction, state of repair, the result you need and the space to install it.
  3. 03Other specialistsIf something needs an asbestos surveyor or structural engineer, we tell you.
  4. 04Written proposalSurface, area, material, depth, preparation and finish, with the layers and assumptions behind the figures.

We check the roof construction, state of repair, result you need and space available to install it. If something needs an asbestos surveyor or structural engineer, we tell you. Our insulation survey doesn't replace their work.

Send the drawings, photographs and previous reports you have. Known layers, repairs, heating, processes and fixed machinery help us plan a useful visit.

You should then get a written proposal showing the surface, area, material, depth, preparation and finish. Calculations should include the layers and assumptions behind the figure.

At our food-sector units in London, 324 m² of metal-deck soffit took 140 mm closed-cell, gauged at 29 points and coated.

See survey or photographs for how to start. Send what you already have; leave opening up concealed layers to the planned inspection.

05When we say no

When we say no

If the roof leaks, the surface won't bond or the structure needs checking, we stop and explain the next step. More foam can't fix an unresolved defect.

If asbestos is present or suspected, involve the dutyholder, a competent asbestos surveyor and HSE guidance. HOLVEM never removes asbestos sheets. If the roof is safe to keep, we encapsulate it; if not, removal is a job for asbestos removal professionals, licensed where HSE requires it.

That is what happened at The Regis School: the container with a live leak was not sprayed. Saying no is part of a proper specification.

Treated storage container at The Regis School in Bognor Regis.Project recordThe Regis School, Bognor Regis

06Where to start

Three questions point to the first step.

Answer the three below. The result names the first step; the survey confirms it for your building.

Spray foam insulation problems

Your roof, in three answers.

1Is water getting in or forming?
2What is the roof?
3Where are you now?

Request a survey

Ask for a survey. We ring to arrange it around your floor.

Where the building is and how to reach you. A specialist rings to agree a time that suits the shift pattern; the survey is free and carries no obligation.

Enter your name.

Enter a UK postcode.

Enter an email address or a telephone number.

Enter an email address or a telephone number.

Before 3pm on a working day, contacted the same day.

07HOLVEM

Why choose HOLVEM for an installation you can check?

A good installation begins with the things we refuse to spray over. At The Regis School, one container had a live leak, so we did not spray it. At our London food-sector units, we checked a 140 mm layer at 29 points. You should expect that care before, during and after the work.

Our own team surveys, specifies and installs. We use certified spray foam systems, which we apply as an accredited installer for the manufacturer, set out the roof layers and depth in writing, and give you the calculations and QA evidence pack at handover. You can see what was promised and what was delivered.

We have completed over 500 installs and work nationwide across England and Wales from four depots. Your roof stays on where it is safe to retain, with the work planned around your premises.

Backed by our 25 year HOLVEM workmanship warranty, plus the manufacturer's 25 year product warranty issued directly to you.

08Questions, answered

Questions about commercial spray foam problems

What are the main problems with spray foam insulation?

The main checks are leaks, material choice, moisture analysis, surface preparation, fire evidence and timber details. Ask how the installer has checked each one on your building.

Can spray foam cause condensation?

Yes, if it is wrongly specified. Open-cell sprayed straight onto a cold metal sheet lets room vapour reach the steel, so condensation forms inside the foam, and on timber a sealed layer in the wrong place can trap moisture. Correctly diagnosed and specified, closed-cell spray foam stops roof condensation. Zero call-backs for condensation. The condensation risk analysis sets the build-up.

Is spray foam insulation good?

Yes, when it is specified for the building and the result you need. Correctly diagnosed and specified, closed-cell spray foam stops roof condensation, and as a bonded layer on a sound commercial metal roof it adds thermal resistance. The roof, moisture route and fire finish decide the specification. Repair existing leaks first, then compare the complete installed work with boards or a liner. A suitable breathable build-up can use open-cell for thermal and acoustic insulation.

Can spray foam be removed?

Yes. Cured foam is bonded to the surface, so taking it off means cutting it away, which is slow work. That is why the decision is made before anything is sprayed: we survey first and only spray a sound, dry roof at a depth set for it. If the water is a leak, it goes to a roofer first: spray foam is not waterproofing.

Is spray foam a fire risk?

Ask for the tested build-up that supports the proposed fire finish. The substrate, depth, lining and coating all matter; your fire strategy sets the requirement.

How do I check an installer?

HOLVEM is an accredited installer for the manufacturer of the spray foam systems we apply. Whoever you choose, check the work and evidence for your building, not just the accreditation.

Send photographs. Show us the roof and the installation problem you want checked.

09In five lines

Spray foam insulation problems, in five lines.

  1. Most spray foam insulation problems on commercial buildings come from the installation, not the foam, and every one is preventable.
  2. If rain gets through a lap, fixing or rooflight, get a roofer in first; spray foam is not waterproofing.
  3. On cold metal, closed-cell gives the rigid, vapour-resistant layer the sheet needs; open-cell is not a swap for it.
  4. Fire evidence belongs to the build-up: substrate, depth and coating or lining. Ask which test applies to your roof.
  5. You should get a written proposal showing the surface, area, material, depth, preparation and finish.

The next step

Send photographs, or start a project brief.

Send photographs of the roof and the installation problem you want checked, or start a project brief with the drawings, previous reports and repairs you have.

Back to the three questions

Where this guide leads

The pages that go deeper on your building, your roof and the price.

Your next step

Your building.
Your brief.
A specialist.

If you already know the thickness or U-value you need, we price to it and confirm it is right; if not, we work it out with you. Tell us what you know about the building and the problem; if something is uncertain, say so. Someone who does this every day reads it and comes back to you.

Start a project brief About five minutes. Photographs help; nothing else is needed.

Or pick up the phone

Telephone . Before 3pm on a working day, you are contacted the same day. After 3pm, the next working day. A commitment to contact, not a quotation.

Want a figure before you talk to anyone? Pick your building for a same-day estimate