Before 3pm on a working day, contacted the same day. After 3pm, the next working day. Contact, not a quotation. Telephone
Start a project brief
A very large modern logistics shed seen at an angle from its service yard, a long facade of pale grey horizontal cladding with a row of closed dock doors and black rubber dock shelters, a wide empty concrete yard with faded markings, flat open farmland beyond. A long flat-topped grassy hill rises behind.

Location · Northamptonshire · East Midlands

Commercial spray foam insulation in Daventry

For Daventry storage and fleet premises, we define the roof area that needs attention around rooflights, plant routes and working bays.

LOCALDaventry: about 1512 m² above an original storage hall treated with closed-cell foam.

Or call . Enquiries before 3pm on a working day are contacted the same day.

  • Over 20 years' experience
  • Thousands of projects
  • Rated 4.8 out of 5 by our customers
  • 25 year workmanship warranty
  • Free, no-obligation survey

Enquiries received before 3pm on a working day are contacted the same day; after 3pm, the next working day.

CoverageCovered from HOLVEM's Bedford depot, one of four depots (Weybridge, Bedford, Manchester, Exeter) that give HOLVEM nationwide coverage.

02Recent projects · Local

Recent projects in and around Daventry.

The installations concern defined parts of storage and fleet premises. The nearby Nuneaton case supplies a separate weekend programme for factory roof work. Mark the rooflights, plant routes and included bays when you Send photographs.

Recent installs near Daventry

  • LocalDaventryDistribution and fulfilment warehouseRoof above the original storage hall with rooflights and plant routes kept openAbout 1512 m² of closed-cell spray foam
  • LocalDaventryFleet service and maintenance workshopPitched roof above selected indoor vehicle baysAbout 417 m² of closed-cell spray foam
  • LocalDaventryOverflow stock storeTargeted treatment to the metal roof above a separate storage bayAbout 211 m² of closed-cell spray foam
  • NearbyNuneaton Signs, Nuneaton2924 m² of factory roof encapsulated25 mm closed-cell, sealed from beneath

Have a roof or soffit in Daventry like these?Five photographs from the floor are often enough for a same-day direction. Before 3pm on a working day, we contact you the same day.

Start a project brief

03Why Daventry buildings need it

Freight infrastructure and the individual storage hall

Daventry’s distribution premises can contain distinct storage halls, service bays and smaller areas within a wider operation. Insulation may address a selected part of that building, with access and treatment boundaries defined around it. Read warehouse and distribution roof insulation.

  1. S1

    Prologis UK describes the DIRFT Super Hub as a 53-acre site with about 840,000 sq ft of warehouse and an integrated rail link. VolkerFitzpatrick identifies large steel-frame warehouses elsewhere at the freight hub.

    Source: Prologis UK, published source (uk-beta.prologis.com)

04How a job runs

Photographs or a survey, a specification, then the application.

The same three stages on every HOLVEM job, in Daventry or anywhere else. You bring the building and what is bothering you about it; we bring the rest, in this order.

STAGE 01Show the roof above each storage or service area, with rooflights, plant routes and boundaries marked

STAGE 02Assess the construction and moisture for the selected scope, including any thermal or coating requirement

STAGE 03Agree preparation and application access around stock movements and fleet activity

05Straight answers

The questions Daventry building owners ask first.

Answered the way the specialist answers them on the call. A question we have not covered? Ask it when we speak. No obligation.

Do you cover Daventry distribution and fleet buildings?
Daventry work is covered from our Bedford depot. Identify the storage hall or vehicle bays concerned, together with rooflights and plant routes around the scope. Start a project brief.
What local Daventry projects are recorded?
The installations cover about 1512 m² above an original storage hall, about 417 m² above selected fleet-service bays and about 211 m² above an overflow storage bay. Explore workshop and garage insulation for the fleet use.
Can I ask about a separate bay within a Daventry complex?
Show its boundaries and connection to the surrounding operation. The overflow project concerns one targeted storage bay, so identify the equivalent roof and access in Send photographs.
What should a DIRFT-area roof enquiry say about operations?
Provide the actual stock movements, service activity and plant-access needs around the proposed roof. The freight hub's wider scale does not establish your building's working arrangements. Add the relevant routes to Start a project brief.
When will you contact me about Daventry premises?
Enquiries received before 3pm on a working day are contacted the same day; after 3pm, the next working day. Mark the included bays, rooflights and plant routes when you Send photographs.
How do I get costs for only the selected storage or service roof?
Use the commercial spray foam cost guide, then give the defined area and construction. Include access around the adjacent operation so the quotation matches the proposed work.
Can warranty cover be explained for separate Daventry roof areas?
25 year HOLVEM workmanship warranty, plus the manufacturer’s 25 year product warranty issued directly to you. Identify the bays you intend to commission and request the documentation for those specified areas. We can discuss cover with the owner or project team through Start a project brief.

06Nearby areas

Also covered from the Bedford depot.

Does the enquiry include a site beyond Daventry? Name its town and storage or service areas separately, with the access routes relevant to that roof.

The next step

Your Daventry building.
Your brief.
A specialist.

If you already know the thickness or U-value you need, we price to it and confirm it is right for the building; if not, we work it out with you. A brief takes about five minutes and photographs are welcome. "Not sure" is a useful starting point.

Or call . Enquiries received before 3pm on a working day are contacted the same day; after 3pm, the next working day. A commitment to contact, not a quotation, a survey or a price.

WarrantyA 25-year HOLVEM workmanship warranty, plus the manufacturer's 25-year product warranty, issued directly to the client by the manufacturer. The scope of each is set out in its written terms.

HOLVEM is an accredited installer for the manufacturer of the spray foam systems we apply.

Start a project brief