Before 3pm on a working day, contacted the same day. After 3pm, the next working day. Contact, not a quotation. Telephone
Start a project brief
An empty office floor stripped for refurbishment, with a pale concrete soffit, columns and a run of windows.

Location · West Sussex · South East

Commercial spray foam insulation in Crawley

For Crawley business premises, connect the energy objective to the existing roof, its condition and the work you want to commission.

NEARBYEpsom: 594 m² of industrial roof underside treated with closed-cell foam and a coating.

Or call . Enquiries before 3pm on a working day are contacted the same day.

  • Over 20 years' experience
  • Thousands of projects
  • Rated 4.8 out of 5 by our customers
  • 25 year workmanship warranty
  • Free, no-obligation survey

Enquiries received before 3pm on a working day are contacted the same day; after 3pm, the next working day.

CoverageCovered from HOLVEM's Weybridge depot, one of four depots (Weybridge, Bedford, Manchester, Exeter) that give HOLVEM nationwide coverage.

02Recent projects · Nearby

Recent projects in and around Crawley.

The Epsom installation concerns a roof underside. Global House combines preparation, closed-cell foam and a silicone coating from above, while Oxted provides a separate leisure-building installation. Tell us the construction and access you have through Start a project brief.

Recent installs near Crawley

  • NearbyOxtedGolf club leisure premisesA second insulation project220 m²Closed-cell spray foam
  • NearbyEpsomCommercial industrial unitRoof underside594 m²Closed-cell spray foam with a coating
  • NearbySteyningCommercial unit on agricultural premises276 m² of corrugated fibre-cement roof underside and box profile metal walls insulated with closed-cell spray foamPurlins received a flash coat
  • NearbyGlobal House, Surbiton1575 m² of asbestos-cement roof25 mm closed-cell roofing foam, applied from above

Have a roof or soffit in Crawley like these?Five photographs from the floor are often enough for a same-day direction. Before 3pm on a working day, we contact you the same day.

Start a project brief

03Why Crawley buildings need it

The scale and variety of Manor Royal

Crawley’s commercial premises bring warehouse, industrial and office uses into a varied building setting. A useful roof specification relates the area being treated to the operation and the improvement intended for that space. Read warehouse and distribution roof insulation.

  1. S1

    Manor Royal BID describes the business district as 540 acres, with over 600 businesses, 700 business units and nine million sq ft of commercial space.

    Source: Manor Royal Business Improvement District, The place
  2. S2

    Irish Real Estate Insider also reports a 200,000 sq ft logistics scheme on Fleming Way.

    Source: Irish Real Estate Insider (IREI), Panattoni wins planning consent for speculative logistics development in

04How a job runs

Photographs or a survey, a specification, then the application.

The same three stages on every HOLVEM job, in Crawley or anywhere else. You bring the building and what is bothering you about it; we bring the rest, in this order.

STAGE 01Show sheets, layers and any earlier coating, together with the energy or moisture concern

STAGE 02Assess condition and construction before defining treatment depth and any coating requirement

STAGE 03Agree preparation and working access for the selected approach around the premises' occupation

05Straight answers

The questions Crawley building owners ask first.

Answered the way the specialist answers them on the call. A question we have not covered? Ask it when we speak. No obligation.

Do you assess commercial buildings in Crawley?
Crawley enquiries are covered from our Weybridge depot. Identify the building and included roof or soffit area, with any energy review already available. Start a project brief.
What nearby roof work supports a Crawley enquiry?
Epsom's project covers 594 m² of roof underside with closed-cell foam and a coating. Global House supplies a separate 1575 m² roof system applied from above. View the Global House project.
Can treatment be considered around an occupied Crawley building?
Explain access above and beneath the proposed area, and which activities need to continue. The application approach and preparation should be agreed against that information. Begin with Send photographs.
How should an energy review of my Manor Royal premises inform the enquiry?
Provide its recommended improvement and any target set for the building, with the roof's existing layers and condition. The specification needs those premises-specific details. Add them to Start a project brief.
When will you contact me about Crawley premises?
Enquiries received before 3pm on a working day are contacted the same day; after 3pm, the next working day. Include earlier roof treatments and the energy-review target when you Send photographs.
How do I get costs for a Crawley roof system?
The commercial spray foam cost guide provides guidance. Supply construction, area and access so the quotation can address underside work or a system applied from above as appropriate.
Can I request warranty information for foam and coating together?
25 year HOLVEM workmanship warranty, plus the manufacturer’s 25 year product warranty issued directly to you. Set out the proposed system and the owner's documentation needs. We can discuss the cover alongside the specified preparation and treatment before agreement. Start a project brief.

06Nearby areas

Also covered from the Weybridge depot.

Enquiring about another premises beyond Crawley? Give its town and any existing roof treatment, with the performance objective for that building.

The next step

Your Crawley building.
Your brief.
A specialist.

If you already know the thickness or U-value you need, we price to it and confirm it is right for the building; if not, we work it out with you. A brief takes about five minutes and photographs are welcome. "Not sure" is a useful starting point.

Or call . Enquiries received before 3pm on a working day are contacted the same day; after 3pm, the next working day. A commitment to contact, not a quotation, a survey or a price.

WarrantyA 25-year HOLVEM workmanship warranty, plus the manufacturer's 25-year product warranty, issued directly to the client by the manufacturer. The scope of each is set out in its written terms.

HOLVEM is an accredited installer for the manufacturer of the spray foam systems we apply.

Start a project brief